Download Print this page

Yamaha YZ125 2016 Owner's Service Manual page 41

Advertisement

D.
Face the joint connector with its
open end downward, and there
is no pinching with peripheral
parts.
E.
Pass the CDI magneto lead and
radiator breather hose between
the frame and the radiator
(right).
F.
Clamp the CDI magneto lead to
the frame at its locating tape.
G.
Bring the connector cover into
contact with the coupler.
H.
Locate the clamp ends in the ar-
rowed range.
I.
Insert the CDI unit band until it
stops at the CDI unit stay.
J.
Pass the CDI magneto lead and
radiator breather hose between
the frame and the radiator hose
so that they come within the ar-
row-indicated range. Also take
care so that the CDI magneto
lead passes on the left of the ra-
diator breather hose.
CABLE ROUTING DIAGRAM
2-17

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Yz125g2 2016