Installing An S5800-54S Switch In A 19-Inch Rack - H3C S5800-54S Instruction Manual

Hide thumbs Also See for S5800-54S:
Table of Contents

Advertisement

Installing an S5800-54S switch in a 19-inch
rack
Table 1 Installing an S5800-54S switch in a 19-inch rack
Installation procedure
1.
Attach the mounting
brackets to the switch.
2.
Attach chassis rails to the
switch.
3.
Install cage nuts in the rack
posts.
4.
Attach slide rails to the
rack posts.
5.
Connect the grounding
cable to the primary
grounding point
6.
Install the switch in the
rack.
NOTE:
The depth of the rack must be a minimum of 1000 mm (39.37 in).
The S5800-54S switch has three grounding points, as shown in
19. The primary grounding point and auxiliary grounding point 1 are
on the right side panel. If you use one of these grounding points, you
must connect the grounding cable to the grounding point before you
mount the switch in the rack.
Remarks
Installation diagram
Required
Required
Required
See
Required
See
Optional
See
See
Required
the mounting position near the
power modules as an example.
7
For mounting near the power
modules, see
Figure
For mounting near the ports,
see
Figure
9.
For mounting near the ports,
see
Figure
8.
For mounting near the power
modules, see
Figure
Figure
10.
Figure
11.
Figure
12.
Figure
13. This figure uses
8.
9.
Figure

Advertisement

Table of Contents
loading

Table of Contents