out of the use of this device. A qualified person is one who has certified
skills and knowledge related to the construction, installation, and operation of this type of
electrical device and who has received safety training to recognise and avoid the hazards
involved.
b.
All applicable local, regional, and national regulations must be applied when installing,
repairing, and maintaining this device.
c.
This charger is integrated with an internal 6mA (DC) RCD, please install a Type A or Type B
breaker externally.

3.2.2 Checks before starting the installation process

a.
Ensure that the location of the charger is convenient for operational access for normal use
and maintenance.
b.
The AC input components within the premises' s power supply are correctly fitted with
required protection items prior to installation of the charger.

3.3 Installation Procedure

a.
Based on the profile of the attached mounting template, drill 3 x Ø 6 x 35 mm holes in the
wall and insert the expansion pipe.
b.
Lock the 2 x M4x32mm self-tapping screws into the expansion pipe, leaving a 5mm space,
between the screw head and the wall.
c.
Open the front cover of the EV charger, hang it on the 2 M4x32 mm self-tapping screws,
lock it into the bottom M4x32 mm self-tapping screw and then cover the sealing cap.