2. Using Phillips #2 screwdriver, tighten the screws to secure the PIB to the system.
Figure 95. Installing the power interposer board
3. Route the cables and connect it to the system board.
Next steps
1.
Install the
PSU.
2.
Install the air
shroud.
3. Follow the procedure listed in
System board
Removing the system board
Prerequisites
CAUTION:
If you are using the Trusted Platform Module (TPM) with an encryption key, you may be prompted
to create a recovery key during program or System Setup. Be sure to create and safely store this recovery key.
If you replace this system board, you must supply the recovery key when you restart your system or program
before you can access the encrypted data on your drives.
1. Follow the safety guidelines listed in the
2. Follow the procedure listed in the
3. Remove the following components:
a.
Air shroud
b.
Expansion cards
c.
Expansion card risers
d.
Mini PERC card
e.
IDSDM module
f.
Internal USB key (if installed)
g.
Processor
h.
Heat sink
i.
Memory modules
j.
LOM riser card
After working inside your
Safety
instructions.
Before working inside your
system.
system.
Installing and removing system components
95