Opop H4 EKO-D Series User Instructions

Opop H4 EKO-D Series User Instructions

Hide thumbs Also See for H4 EKO-D Series:

Advertisement

Quick Links

OPOP spol. s.r.o., Zašovská 750, 757 01 Valašské Meziříčí I www.opop.cz I sales@opop.cz I +420 571 675 589
H4EKO-D
USER INSTRUCTIONS

Advertisement

Table of Contents
loading

Summary of Contents for Opop H4 EKO-D Series

  • Page 1 OPOP spol. s.r.o., Zašovská 750, 757 01 Valašské Meziříčí I www.opop.cz I sales@opop.cz I +420 571 675 589 H4EKO-D USER INSTRUCTIONS...
  • Page 2: Table Of Contents

    H4EKO-D Instructions CONTENT 1. INTRODUCTION ................................3 2. BOILER CHARACTERISTICS ............................. 3 3. TECHNICAL DESCRIPTION .............................. 3 4. TECHNICAL PARAMETERS ............................. 4 5. LIST OF REPLACEABLE SPARE PARTS ..........................7 7. BOILER INSTALLATION ..............................8 8. COOLING LOOP ASSEMBLY ............................9 10.
  • Page 3: Introduction

    H4EKO-D Instructions 1. INTRODUCTION Dear Customer, We appreciate that you have chosen a product from our product range and become one of our customers. We hope that you are content with our product. We hope that our product serves you reliably and for a long time. All employees of our company contribute to this.
  • Page 4: Technical Parameters

    H4EKO-D Instructions There is a boiler tube heat exchanger behind the combustion chamber, this is equipped with turbulators to reduce the chimney temperature and the amount of dust particles in the air. The boiler’s design is simple, but it still meets the strictest criteria of emission standards.
  • Page 5 H4EKO-D Instructions Fuel consumption is directly dependent on the quality and type of fuel used, as well as maintaining the cleanliness of the internal heat exchange surfaces of the boiler. The smaller the chopped wood, the greater the boiler output, but the burning time per one filling is shortened.
  • Page 6 H4EKO-D Instructions Front part of the boiler: Left side of the boiler: • • Control unit Primary air flap • • Secondary air flap Exhaust flap pull rod for adding fuel • • Ashpan door Cleaning closure at the bottom of the boiler Back part of the boiler: Right side of the boiler: •...
  • Page 7: List Of Replaceable Spare Parts

    H4EKO-D Instructions Stops are located on all primary and secondary air flaps to prevent the complete closing of air supply to the boiler. Therefore, it’s not possible to extinguish the boiler by closing the flaps to the limit position, which is not permissible according to standards.
  • Page 8: Boiler Installation

    The solid fuel boiler may only be installed by a company with a valid authorisation to install it or by authorised personnel from our company. The list is available at opop.cz or you can request it by telephone at 571 675 589. An installation project must be prepared according to the valid regulations.
  • Page 9: Cooling Loop Assembly

    H4EKO-D Instructions The flue path piping mounted on the boiler must be firmly assembled and mounted to prevent accidental or spontaneous release. We recommend that the flue from the boiler to the chimney is no longer than 1 m and that it rises towards the chimney; recommended slope of at least 5% (3°).
  • Page 10 H4EKO-D Instructions...
  • Page 11: Hydraulic Diagrams

    H4EKO-D Instructions 11. HYDRAULIC DIAGRAMS CONNECTION WITH 1 HEATING CIRCUIT, MIXING VALVE, BUFFER TANK No Part Type / Component / Description Electrical Order number connector CH pump Primary circuit pump CH pump Mixing valve 1 3- or 4-way mixing valve Valve (connected to 431N module) KTY mixing valve 1 sensor...
  • Page 12 H4EKO-D Instructions CONNECTION WITH 1 HEATING CIRCUIT, MIXING AND THERMOSTATIC VALVE, BUFFER TANK No Part Type / Component / Description Electrical Order number connector CH pump Primary circuit pump CH pump Thermostatic valve 3-way thermostatic valve KTY mixing valve 1 sensor Valve 1 sens.
  • Page 13: Control Unit

    H4EKO-D Instructions 12. CONTROL UNIT House heating – Indicator of heating type. This can be divided into the following types: House heating – Only the central heating (CH) pump is active b. DHW priority – The DHW pump is activated as a priority; after the set DHW temperature has been reached, the DHW pump is deactivated and the CH pump is activated to ensure water circulation in the primary circuit Parallel –...
  • Page 14: The Control Unit' S Basic Settings

    H4EKO-D Instructions d. Summer mode – Only the DHW pump is active. Current date, room thermostat indication, flue gas temperature. The entered and actual temperature of the central heating measured at the back of the boiler on the boiler outlet water pipe.
  • Page 15 H4EKO-D Instructions • valve 2 (shows the operating parameters of additional valve 2). ATTENTION: In order for the valve parameters panels to be active, these valves must be installed and configured correctly by the specialist. 4. Temperature settings Here you can select the desired temperature of the boiler’s outlet water ‘CH temperature’ and the required boiler temperature ‘DHW temperature’...
  • Page 16: Installation Menu

    H4EKO-D Instructions 7. Time settings Select the current time so that the functions that work with the current time work properly. 8. Date settings Select the current date so that the functions that work with the current date work properly. 9.
  • Page 17 • OPOP (RT10) controller operation – This option is active only in cooperation with the OPOP (RT10) room controller and allows to choose an option of the controller’s cooperation with the mixing valve: Temperature reduction –...
  • Page 18 (traditional two-position) and OPOP/TECH (RT10) controller. When the OPOP/TECH controller is connected, the user has the possibility to control and change the set CH, DHW and mixing valve temperatures. All boiler controller alarms are also displayed. When working with the mixing valve, the user can see the current outdoor temperature on the display panel with valve parameters.
  • Page 19: The Control Unit's Basic Settings

    H4EKO-D Instructions The user here sets the daily cycle and pump breaks for 30 minutes. To facilitate setting these parameters, there is a possibility of copying the selected time interval to other days. Once the operating plan has been established, it is necessary to set the working time and pump shutdown time during the activity in the previously selected time interval.
  • Page 20: Operation

    H4EKO-D Instructions The wood in the boiler burns out through the refractory nozzle. Place small pieces of wood and chips on the nozzle so that the nozzle is permeable and the flame can pass through the nozzle. Use a paper or a solid ignitor for igniting. Press ‘Igniting’ in the menu and the fan will be activated. The ideal fan speed for igniting is in the range of 20 to 40%.
  • Page 21: Extinction

    H4EKO-D Instructions Never leave the suction flap rod in the open position during the boiler operation. Otherwise, the fuel in the filling shaft will burn upwards, not through the nozzle. This may cause damage to the metal parts in the filling shaft or damage to the suction flap. Not to mention that all of your heat would have fled to the chimney before it was transferred to the water.
  • Page 22 H4EKO-D Instructions implemented, certain residual risks resulting from the risk analysis that are given by the technological process during the different phases of the device's life remain in the boiler operation. These are risks that particularly that arise from the boiler operator's inattention and non-compliance with safety rules during operation.
  • Page 23: Measures In Case Of Failure

    MOSFET temperature too high alarm message. Check the exhaust fan's operation, remove it, clean it and try again. If the problem persists, call the OPOP service. Damaged equithermal valve sensor If you connect an outdoor temperature sensor, it is possible to control the mixing valve equithermally.
  • Page 24 40°C by that time, an alarm message will occur. Module not found If the boiler is connected to the Internet via opop.emodul.eu, it may happen that the connection to the router is not detected during registration. In this case, make sure that the Internet cable connection is OK, that you are registering according to the instructions.
  • Page 25 Make sure that the system and the boiler have water, the pumps work properly and the boiler is installed with the buffer tank according to the law. Alternatively, call the OPOP service. • In terms of safety and economy of operation, the appliance must be operated according to the Instructions.
  • Page 26: Energy Efficiency

    % OPOP s.r.o. H435 EKO-D OPOP s.r.o. H442 EKO-D OPOP s.r.o. H449 EKO-D OPOP s.r.o. H455 EKO-D 23. IDENTIFICATION MARKS H435 EKO-D Model identification mark:...
  • Page 27 In standby mode Contact details OPOP s.r.o., Zašovská 750, Valašské Meziříčí, 757 01 (*) Tank volume = 45 × Pr × (1 – 2.7/Pr) or 300 litres, whichever is higher; Pr expressed in kW (**) Tank volume = 20 × Pr; Pr expressed in kW...
  • Page 28 In standby mode Contact details OPOP s.r.o., Zašovská 750, Valašské Meziříčí, 757 01 (*) Tank volume = 45 × Pr × (1 – 2.7/Pr) or 300 litres, whichever is higher; Pr expressed in kW (**) Tank volume = 20 × Pr; Pr expressed in kW...
  • Page 29 In standby mode Contact details OPOP s.r.o., Zašovská 750, Valašské Meziříčí, 757 01 (*) Tank volume = 45 × Pr × (1 – 2.7/Pr) or 300 litres, whichever is higher; Pr expressed in kW (**) Tank volume = 20 × Pr; Pr expressed in kW...
  • Page 30 In standby mode Contact details OPOP s.r.o., Zašovská 750, Valašské Meziříčí, 757 01 (*) Tank volume = 45 × Pr × (1 – 2.7/Pr) or 300 litres, whichever is higher; Pr expressed in kW (**) Tank volume = 20 × Pr; Pr expressed in kW...
  • Page 31: Regulations And Standards

    The OPOP boilers may only be installed by a company with a valid authorisation to carry out such installation and maintenance. An installation project must be prepared according to the valid regulations.
  • Page 32 Technical Parameters chapter. The OPOP boiler must be installed in a separate boiler room, specially adapted for heating. The boiler room must have sufficient space for the boiler's installation and maintenance. There must be sufficient circulation of fresh air for combustion.
  • Page 33: Warranty Card

    Instructions 27. WARRANTY CARD For the H435EKO-D, H442EKO-D, H449EKO-D, H455EKO-D hot water boilers Manufacturer: OPOP spol. s r.o., Valašské Meziříčí Telephone: 571 675 589, fax.: 571 611 225 Dispatch date from the plant:_________________________________________ The user is obliged to have a professional service company to put the equipment into operation, to conduct regular maintenance and repairs.
  • Page 34 H4EKO-D Instructions For a steel weldment – we guarantee its permanent tightness as standard for two years from the date of release from the production plant. The above-standard 60-month guarantee is guaranteed if the heating system has not used a pressurised expansion vessel, the required temperature range of the heating water is ensured and the leak is due to poor quality material or welding work.
  • Page 35: Declaration Of Conformity

    H4EKO-D Instructions 28. DECLARATION OF CONFORMITY...
  • Page 36: Registration Card

    We are extremely pleased that you have decided to buy our product. This decision entitles you to a 20% discount on spare parts. In order to receive the above benefits, it is necessary to fill in the registration card and send it to our address: OPOP spol s r.o. Sales Department Zašovská...
  • Page 37 H4EKO-D Instructions OPOP, spol. s r. o. Zašovská 750 757 01 Valašské Meziříčí Bank details: Komerční banka a.s., account number: 1608851/0100 Business ID No: 47674105, VAT ID No: CZ 47674105 Telephone: Sales Department: 571 675 589; Secretariat: 571 611 250; Production: 571 675 405 Supply: 571 675 114;...

This manual is also suitable for:

H425 eko-dH435 eko-dH442 eko-dH449 eko-dH455 eko-d

Table of Contents