Gas Heating Sequence Of Operations; Ignition Control Board; Electric Heat Limit Setting 42" Cabinet; Electric Heat Anticipator Setpoints - York ZF150 Installation Manual

Hide thumbs Also See for ZF150:
Table of Contents

Advertisement

518674-YIM-C-0610
Table 23: Electric Heat Limit Setting 42" Cabinet
UNIT (TONS)
ZF078, 090 (6.5, 7.5)
ZF078, 090 (6.5, 7.5)
ZF078, 090 (6.5, 7.5)
Flash Codes
The UCB will initiate a flash code associated with errors within
the system. Refer to UNIT CONTROL BOARD FLASH CODES
Table 29.
Reset
Remove the call for heating by lowering the thermostat setting
lower than the conditioned space temperature.This resets any
flash codes.

Electric Heat Anticipator Setpoints

It is important that the anticipator setpoint be correct. Too high
of a setting will result in longer heat cycles and a greater
temperature swing in the conditioned space. Reducing the
value below the correct setpoint will give shorter "ON" cycles
and may result in the lowering of the temperature within the
conditioned space. Refer to Table 24 for the required electric
heat anticipator setting.
Table 24: Electric Heat Anticipator Setpoints
SETTING, AMPS
W1
0.13

Gas Heating Sequence Of Operations

For units with VFD and gas heat, the speed of the indoor
blower motor continues to be controlled by duct static
pressure via the VAV control board.
If there are VAV boxes present in the duct system, the
boxes must be driven to the full-open position using a
customer-supplied power source to assure adequate
airflow across the heat exchanger tubes.
54
LIMIT
HEATER
VOLTAGE
SWITCH
kW
OPENS °F
9
135
18
150
208/230
24
165
34
190
9
135
18
150
480
24
165
34
185
9
135
18
150
600
24
150
34
185
W2
0.1
When the thermostat calls for the first stage of heating, the low-
voltage control circuit from "R" to "W1" is completed. A call for
heat passes through the UCB to the Ignition Control Board
(ICB). The UCB monitors the "W1" call and acts upon any call
for heat by monitoring the Gas Valve (GV). Once voltage has
been sensed at the GV, the UCB will initiate the fan on delay for
heating, energizing the indoor blower the specified delay has
elapsed.
When the thermostat has been satisfied, heating calls are
ceased. The GV is immediately closed. The blower is de-
energized after the fan off delay for heating has elapsed. The
draft motor performs a 30-second post purge.

Ignition Control Board

First Stage Of Heating
When the ICB receives a call for first stage of heating, "W1," the
draft motor is energized. Once the draft motor has been proven,
a 30-second purge is initiated. At the end of the purge, the GV
is opened, and the spark ignitor is energized for 10 seconds.
The ICB then checks for the presence of flame. If flame is
detected, the ICB enters a flame stabilization period. If flame
was not detected, the GV closes, and a retry operation begins.
During the flame stabilization period, a loss of the flame for 2
seconds will cause the GV to close and the retry operation to
begin. After the flame stabilization period, a loss of flame for 3/4
second will cause the GV to close and the retry operation to
begin.
At the conclusion of the flame stabilization period, the ICB will
operate the gas heat in high fire for an additional 60 seconds
(for a total for 120 seconds of high fire operation). After this 60
seconds, the ICB will then use the call for the second stage of
heat to control second stage operation of the GV.
When "W1" is satisfied, both valves are closed.
Second Stage Of Heating
When the ICB receives a call for the second stage of heating,
"W2," the ICB conducts a complete first stage ignition
sequence. If this sequence is satisfied, the second main valve
of the GV is opened.
When "W2" is satisfied, the second main valve is closed.
Retry Operation
When a flame is lost or is not detected during an attempt to
achieve ignition, a retry operation occurs. A 30-second purge is
performed between ignition attempts.
If the unit fails after three ignition attempts, the furnace is
locked-out for one hour. The furnace is monitored during this
one-hour period for unsafe conditions.
Johnson Controls Unitary Products

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zf120Zf seriesZf102Zf090Zf078

Table of Contents