A.6 Option: SCHUKO socket
Connecting the supply cable
Risk of electric shock
When connecting the SICHARGE charging station, pay attention to the five safety rules.
Equip the HAK housing with a meter cabinet and a building junction box. Follow the
guidelines of your local network operator.
To connect the supply cable, proceed as follows:
1. Strip the supply cable above the strain relief of the building junction box.
2. Insert the supply line from below into the HAK housing and the building junction box.
3. Connect the supply cable according to the following criteria:
– Specifications of the local network operator
– Grid mode of the supply network
– Specifications of the building junction box manufacturer
4. Tighten the terminal points in the building junction box according to the specifications of
the building junction box manufacturer.
5. Wire the building junction box to the meter cabinet according to the specifications of the
local network operator.
6. Connect the connecting cable of the SICHARGE charging station in the meter cabinet of
the HAK housing.
A.6

Option: SCHUKO socket

SCHUKO socket type D, E, or F
The SCHUKO socket shown in the illustration is available in the following versions.
• Type D (on request)
• Type E
• Type F (on request)
100
DANGER
SICHARGE Operating Instructions MID
Operating Instructions, 02/2023, A5E48573001-AF