Energy zeroCO2 A0070230E11 Operation Manual page 48

Wallbox sun charger
Table of Contents

Advertisement

6. Installation and wiring
7. To connect the communication cable, remove the cap 1 Figure 39 (inside there is a plastic
nut that will have to be removed) and install the cable gland supplied in the kit (Figure 40).
Fix and tighten the cable gland (6Nm) in order to restore the declared IP protection value.
8. Close the battery charger body and secure with the relative screws (Figure 38).
9. Fix the front plate and tighten the screws in the lower part (Figure 39).
. 48 .
Figure 38
Figure 40
Figure 39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zeroco2 a0220400e11

Table of Contents