Trane CLCP Manual page 8

Table of Contents

Advertisement

Assembly & Installation
CLCP Paneling
REMOVING WEDGE METHODOLOGY
ACCESSORIES
AIR/ELECTRIC
SCRAPER
2 NOS.8"
2"DIA NYLON-FACE
DRILL
(HARD BLADE
BLADE LENGTH
HAMMER
PREFERRED)
SCREWDRIVER
REMOVING WEDGE METHODOLOGY
SEQUENCE TO REMOVE WEDGES
AFTER WEDGE NO.3
REMOVED GO INSIDE BOX
3
TO PUSH OFF THE PANEL.
1
2
4
PULL WEDGE-OFF
190mm
LIMITED SPACEFOR TOOLS
TO REMOVE WEDGE
INSERTING WEDGE METHODOLOGY
ACCESSORIES
1"×2"×10"WOOD
2"DIA NYLON-FACE HAMMER
SPACER
V-GROOVE HELPS
(STICK-ON RUBBER)
TO EASE WEDGING
GRROOVE
2mm
REQUIRED TO
INSERTING WEDGE
ACCESSORIES TO DISMANTLE & ASSEMBLE CLCP
ACCESSORIES
AIR/ELECTRIC
SCRAPER
2 NOS.8"
2"DIA NYLON-FACE
DRILL
(HARD BLADE
BLADE LENGTH
HAMMER
PREFERRED)
SCREWDRIVER
PNEUMATIC
M8 & M10×200mm
SLIDING-HEAD BAR
1"×2"×10"
BLINDRIVET
INSERT-BIT
CLAMPS(8"OPEING)
WOOD
TOOL
HOLDERS
(MAGNTIC TYPE)
PERSONAL PROTECTION EQUIPMENTS
SAFETY
SAFETY
SAFETY
FEET PROTECTION
HAND PROTECTION
EYE PROTECTION
ALERT
ALERT
ALERT
10
Assembly & Installation CLCP
VERTICAL UNIT JOINING METHOD
SILICON
HEX.HD.BOLT.
M10X35
BREAK POINT
COMMECTOR
GASKET
HEX.NUT M10
FINAL FILTER JOINING METHOD
FINAL FIL TER SECTION
FINAL FIL TER
UNIT BASE
SILICON
ANGLE
RIVET
GASKET
HEX.HD.BOLT.M12X35
11

Advertisement

Table of Contents
loading

Table of Contents