Finish The Installation - Kohler OVE K-24719T-S2 Installation Instructions Manual

Vitreous china wall-hung p-trap toilet
Table of Contents

Advertisement

4. Install The New Bowl
Apply a little silicone sealant along the edge, to fill the gap
between bowl and wall.
See Fig. 4a.
4.
4a
Place the new bowl on the wall through the carrier. Wrench
the nut to tighten and make them attached securely.
See Fig. 4b.
·
Torque for tightening nuts is recommended to be within
the range from 8 Nm to 12 Nm.
4b
·
Adjust to horizontal and finish tightening.

FINISH THE INSTALLATION

FINISH THE INSTALLATION
1. Ensure that all the connections are tight.
2. Turn on the water supply and check for any leaks.
3. Flush the toilet to check for correct operation.
1363380-T01-B
8Nm 12Nm
See Fig. 4c.
4c
Fig. #4c
4c
1
Apply sealant to make sure the bowl's edge seals to the wall.
See Fig. 4d.
1.
2.
3.
-5-
Fig. #4a
4a
Fig. #4b
4b
4d
Fig. #4d
4d

Advertisement

Table of Contents
loading

Table of Contents