Replacing The Pump Drive Belt - Toro Z Master Z147 Operator's Manual

With 44in sfs side discharge mower
Hide thumbs Also See for Z Master Z147:
Table of Contents

Advertisement

2. Stop the engine, remove the key, and wait for all
moving parts to stop before leaving the operating
position.
3. Remove belt covers over outside spindles.
4. Loosen outer nut on spring eye bolt (Fig. 65).
3
1
4
5
6
Figure 65
Top View
1. Outer nut
2. Idler pulley
3. Idler arm
4. Spring eye bolt
5. Remove belt. Start at outside pulley and rotate off
(Fig. 66).
Note: Do not remove spring.
Caution
Spring is under tension when installed and can
cause personal injury.
Do not remove spring from spring eye bolt.
6. Remove spring loaded idler pulley (Fig. 65).
7. Route new belt through idler arm (Fig. 65).
8. Reinstall idler pulley and route belt onto other pulleys
(Fig. 66).
9. Retighten outer nut on spring eye bolt (Fig. 65).
Note: Check spring length. The spring should measure
9–3/8 inch
1/8 inch (238 mm
Adjust if it does not (Fig. 65).
10. Install belt covers over outside spindles.
2
7
M–4197
5. Spring
6. 9–3/8 inch
1/8 inch
(238 .3 mm)
7. Deck belt
3 mm) when installed.
45
4
2
Figure 66
Top View
1. Deck belt
2. Idler arm
3. Outside pulley

Replacing the Pump Drive Belt

Check pump drive belt for wear after every 50 hours of
operation.
1. Remove deck belt first. See Replacing the Deck Belt
on page 44.
2. Remove bolt from clutch strap and unplug clutch
electrical wire (Fig. 67).
3. Pull spring loaded idler to side. Remove traction belt
from the engine and hydro pump pulleys (Fig. 67).
4. Install new belt around engine and hydro pump pulleys
(Fig. 67).
5. Pull spring loaded idler to side and align belt. Release
pressure on spring loaded idler (Fig. 67).
6. Reinstall deck belt.
1
5
3
M–4269
4. Spring
5. Idler pulley

Advertisement

Table of Contents
loading

This manual is also suitable for:

74161

Table of Contents