Standard Grille Installation - Friedrich PDH15K5 Installation & Operation Manual

Packaged terminal air conditioners & heat pumps
Table of Contents

Advertisement

Installation Instructions Model PXGA Standard Grille
1. Remove the center support and weatherboard if still
installed in the sleeve.
2. Insert six plastic grommets into the grille openings from
the outside of the grille as shown in Figure 9.
3. Insert two #8 x ⅜" sheet metal screws (provided) in the
top two outside edge plastic grommets, and tighten them
half way into the grommets.
WARNING
Falling Object Hazard
A safety line should be attached to
the grille and an anchor point inside
the building during installation.
Property damage, injury or death
can occur by grilles falling from a
building during installation.
Figure 9
Standard Grille
PXGA Standard Grille
Quantity
1
Stamped Aluminum Grille
6
Plastic Grommets
6
#8 x ⅜" Sheet Metal Screws
13
Description
920-087-06
4. Grasp the grille by the attached plastic handles. Position
it with the condensate drain knockouts facing down.
From inside the building, maneuver the grille through the
wall sleeve and pull toward you until the screw heads are
inserted into the keyhole slots at the top of the wall sleeve.
Tighten the two screws completely.
5. Insert the remaining screws into the remaining holes and
tighten securely.
Wall sleeve
Weatherboard
Center support
Plastic
Plastic handles
grommets

Advertisement

Table of Contents
loading

Table of Contents