Advertisement

Heat Pump Elevation Chart
Design Temperature Suggested Minimum Elevation
+15° and above
-5° to +14°
Below -5°
Roof Top Installation (Figure 2)
1. Before locating the unit on the roof, make sure that
the strength of the roof and beams is adequate to
support the weight involved. (See specification sheet
for weight of units). This is very important and the
installer's responsibility.
2. Make a proper consideration for weather-tight integrity
of the roof and proper drainage of condensate.
3. To ensure proper condensate drainage, unit must be
installed in a level position.
4. Consideration should also be given to shade,
appearance, and noise.
Figure 2: Rooftop Installation
Roof Curb Installations
NOTE: Sufficient structural support must be
determined prior to locating and mounting the
curb and package unit.
Curb insulation, cant strips, flashing and general roofing
material are furnished by the contractor.
Curbing must be installed in compliance with the National
Roofing Contractors Association Manual. Construct duct
work using current industry guidelines. The duct work must
be placed into the roof curb before mounting the package
unit. See FIGURE 3: ROOFCURB INSTALLATION.
2 ½"
8"
12"

Rigging Details

NOTE: Provisions for forks have been included in
the unit base frame. No other fork locations are
approved.
5
Figure 3: Roofcurb Installation
To prevent property damage, the unit should remain in an
upright position during all rigging and moving operations.
To facilitate lifting and moving when crane is used, place
the unit in an adequate cable sling.
If units are lifted two at a time, the fork holes on the
condenser end of the unit must not be used. Minimum for
length is 42" to prevent damage to the unit; however, 48" is
recommended.