Installing The Discharge Tubes - Toro E-Z Vac 79345 Operator's Manual

Complete twin bagger timecutter hd and titan riding mower
Hide thumbs Also See for E-Z Vac 79345:
Table of Contents

Advertisement

Figure 27
1. Blower pulley
2. Blower in position (housing
portion removed for
illustrative purposes)
3. Spring
4. Idler-pulley post
2.
Ensure that the belt remains aligned to the
blower pulley while you are installing the blower
assembly.
3.
Pull the spring loaded idler pulley away from the
fixed spring post, and route the belt around the
mower deck pulley
Note:
Ensure that the belt is routed around the
blower pulley correctly.
4.
Route the belt around the drive pulley as
illustrated in
Figure 26
5.
Install the powered bagger cover over the belt
cover, and secure it by tightening the knob
(Figure
28).
5. Idler arm
6. Drive pulley
7. Idler/tension pulley
8. Blower belt
(Figure
27).
and
Figure
27.
1. Knob
2. Powered bagger cover
13
g201513
Installing the Discharge
Tubes
Parts needed for this procedure:
1
Upper tube
2
Screw (1/4 x 3/4 inches)
2
Washer (1/4 inch)
2
Locknut (1/4 inch)
1
Lower tube
Procedure
Important:
Make sure that the mower deck is in
the lowest height-of-cut position before installing
the discharge tubes.
Note:
Remember to install the grass deflector when
you remove the bagger from the mower.
1.
Disengage the PTO and engage the parking
brake.
2.
Shut off the engine and remove the key.
3.
Lower the mower deck to the lowest height-of-cut
position.
4.
Remove the bags for viewing the tube under
the hood.
5.
Lower and latch the hood.
6.
Use both latches to attach the lower tube to the
blower assembly
Note:
Ensure that the notch in the lower tube is
at the bottom when installed
18
Figure 28
3. Belt cover
(Figure
29).
(Figure
31).
g201515

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-z vac 79346

Table of Contents