Trane Precedent YSJ072 Installation, Operation And Maintenance Manual page 49

Packaged rooftop air conditioners cooling and gas/ electric
Table of Contents

Advertisement

Table 11. Temperature vs. resistance (continued)
Temperature
Degrees °F
Degrees °C
50°
10.0
55°
12.8
60°
15.6
65°
18.3
70°
21.1
75°
23.9
80°
26.7
85°
29.4
90°
32.2
95°
35.0
Table 12. Sizing natural gas pipe mains and branches
Iron Pipe Size (IPS) Inches
Length
1/2-in.
3/4-in.
of Pipe
Pipe
Pipe
(Ft.)
15
76
176
30
52
120
45
43
99
60
38
86
75
-
77
Note: Capacity of pipe of different diameters and lengths in Cu. Meter per
Hr. with pressure drop of 74.6 Pa and specific gravity of 0.60.
RT-SVX071D-EN
Nominal Resistance
(kOhms)
19.96
17.47
15.33
13.4
11.89
10.50
9.297
8.247
7.330
6.528
1-in.
1¼-in.
1½-in.
Pipe
Pipe
Pipe
345
750
1220
241
535
850
199
435
700
173
380
610
155
345
545
Table 13. Iron pipe size (SI) millimeters
Iron Pipe Size (SI) Millimeters
Length of
15 mm
20 mm
Pipe
Pipe
Pipe
(Meters)
4.6
2.15
4.98
9.1
1.47
3.39
13.7
1.21
2.80
18.3
1.07
2.43
22.9
2.18
Note: Capacity of pipe of different diameters and lengths in Cu. Meter per Hr. with
pressure drop of 74.6 Pa and specific gravity of 0.60.
Figure 71. Schematic diagram for field gas piping to
Units
Installation
25 mm
32 mm
40 mm
Pipe
Pipe
Pipe
9.76
21.23
34.54
6.82
15.14
24.06
5.63
12.31
19.82
4.89
10.76
17.27
4.38
9.76
15.40
49