Conversion to Horizontal — Model
YHJ072***BL
Note: An elbow is not required for this conversion.
1. Remove vertical slide bracket screw.
2. Slide the vertical slide bracket down to expose the
holes in the vertical tube. See and
Figure 53, p.
37.
3. Reattach bracket screw to secure vertical slide bracket
in new position.
36
Vertical slide bracket -
new position
90 degree elbow
installation location
Pickup tube - new
poisition
Vertical hole(s) available
for horizontal
Vertical slide bracket -
new position
Figure 52, p.
36, and
Figure 51. DAS tubing factory installation for
downflow
Figure 52. DAS tubing after conversion to horizontal