Loading The Nailer; Operation - Makita AN902 Instruction Manual

Construction coil nailer
Hide thumbs Also See for AN902:
Table of Contents

Advertisement

Available languages

Available languages

Loading the nailer

1
► 1. Door 2. Latch lever 3. Magazine cap
Select nails suitable for your work. Depress the latch
lever and open the magazine cap.
► 1. Coil support plate 2. Graduation
Lift and turn the coil support plate so that the arrow with
nail size indicated on the coil support plate will point to
the corresponding graduation increment marked on the
magazine. If the tool is operated with the coil support
plate set to the wrong step, poor nail feed or malfunc-
tion of the tool may result.
1
► 1. Feed Claw
Place the nail coil over the coil support plate. Uncoil
enough nails to reach the nail guide. Place the first nail
in the feeder and the second nail in the feed claw. Place
other uncoiled nails on feeder body. Close the maga-
zine cap slowly until it lock after checking to see that the
nail coil is set properly in the magazine.
3
2
1
2
Connecting air hose
► 1. Air fitting 2. Air socket
Slip the air socket of the air hose onto the air fitting on
the nailer. Be sure that the air socket locks firmly into
position when installed onto the air fitting. A hose cou-
pling must be installed on or near the tool in such a way
that the pressure reservoir will discharge at the time the
air supply coupling is disconnected.

OPERATION

CAUTION:
Make sure all safety systems are in working
order before operation.
NOTE: The change lever is set in the sequential
mode (intermittent nailing mode) in the factory.
For continuous nailing mode
Rotate the lever to the
button on the other side of the lever.
1
2
► 1. Trigger 2. Change lever
6 ENGLISH
1
2
position while pressing the

Advertisement

Table of Contents
loading

Table of Contents