Documentation required The following technical documentation is required for repairs: Instruction booklet of specific model Technical documentation of specific model Equipment As well as the standard equipment, the following tools are required: 1 Special screwdriver with Torx T10 tip 1 Digital thermometer with scale of > 150°C Must be suitable for measuring in liquids and on surfaces Safety warnings Before starting operations on the machine, consult the relative instruction booklet.
“ Incanto RONDO’ ” Technical data Power supply and output: 230 V~ ; 50 Hz ; 1250 W 120 V ; 60 Hz ; 1250W 100 V ; 60 Hz ; 1250 W Safety system: Safety thermostat at 175 °C...
INCANTO RONDO’ test mode In test mode, faults can be easily identified thus reducing the time required for fault finding procedures. To enter test mode, the machine must be switched off with the valve closed. � ��������������� � ��� �...
Page 6
Potentiometer 4 in position MAXIMUM Coffee grinder operation Button 3 Ensure correct operation of the coffee grinder. Check the noise level of the coffee grinder. (At the end of grinding, led 4 turns off) Check microswitches in test mode MICROSWITCH POS.
COVER disassembly Phase 1 Loosen the 2 cover screws Remove the coffee grinder screw Phase 2 Loosen the 2 rear cover screws Phase 3 Remove the seal from the coffee container Phase 3 Pull the side knob to remove Remove the cover. N.B.
ELECTRONICS disassembly EN Incanto DOT.indd 18/05/2005, 12.05...
Page 12
Phase 4 Loosen the 4 screws securing the card to the support. Phase 5 Remove the fl at cable from the power/ CPU card Phase 6 Use a small screwdriver to prise off the chrome plated adjustment ringnut. Phase 7 Loosen the 4 screws and remove the front panel.
Page 13
Phase 8 Loosen all screws securing the card to the support. The fi gure illustrates the electronic assembly completely disassembled. N.B. For assembly, perform the above procedure in reverse order EN Incanto DOT.indd 18/05/2005, 12.05...
PLATE UNIT DISASSEMBLY Phase 1 Remove the rear tank support. Phase 2 Detach the earthing faston connector on the door. Disconnect the steam pipe. Phase 3 Detach the door from the housing. Phase 4 Loosen the 4 screws securing the plate to the housing.
Page 15
Phase 5 Loosen the two screws securing the cable winder. Phase 6 Detach the earthing faston connector shown in the fi gure. Phase 7 Remove the assembly plate unit from the housing. N.B. For assembly, perform the above procedure in reverse order EN Incanto DOT.indd 18/05/2005, 12.05...
COFFEE GRINDER PLATE disassembly Phase 1 Loosen the two screws of the valve. Phase 2 Remove the two screws on the plate. Phase 3 Cut the retainerclips andremove the coffee grinder plate. N.B. For assembly, perform the above procedure in reverse order EN Incanto DOT.indd 18/05/2005, 12.05...
BOILER disassembly Phase 1 Loosen the 3 screws securing the boiler to the plate. Phase 2 Detach all faston connectors on the boiler. Phase 3 Lift the protection covers (1) Loosen and detach the connection pipes (2) N.B. For assembly, perform the above procedure in reverse order EN Incanto DOT.indd 18/05/2005, 12.05...
GEARMOTOR disassembly Phase 1 1) disassembly THE HOUSING 2) Remove the base plate: loosen the upper fixing screws (1) and lower fixing screws (2). Remove the earthing wire of the housing and lift the housing plate. 3) Loosen the screws of the heat exchanger (3) 4) Remove the heat exchanger power supply.
Page 19
WARNING! The motor of the gearmotor (1) cannot be removed without disassembling the pump. N.B. For assembly, perform the above procedure in reverse order EN Incanto DOT.indd 18/05/2005, 12.05...
Coffee grinder disassembly and assembly Phase 1 Disconnect the grinder motor wiring from the rest of the wiring by cutting the three clips indicated by the arrows (taking great care not to cut the wires) and remove the black circular clip. Phase 2 Detach the power cable and grinder motor sensor cable from the control card.
Page 21
Phase 5 Proceed with removal of the sensor from the flange seat, pressing on the anchoring tab. Phase 6 Remove the sensor support from the flange seat with the aid of a small screwdriver (as shown in the figure). Phase 7 Disconnect the motor power cables.
Page 22
Phase 9 Fit the rubber cap of the flange of the new grinder motor. Phase 10 Insert the sensor assembly removed from the old grinder motor onto the flange of the new grinder motor, taking care to align to with the sensor insertion guides.
Page 23
Phase 13 10 mm If the gearwheel ring is damaged, disassemble the toothed wheel using a 10 mm key and a 7 mm key to unscrew the locknut. Otherwise, proceed from Phase 23. 7 mm Phase 14 Insert the new gearwheel ring and couple with the gear of the pin and proceed with fixture by inserting with washer and locknut.
Page 24
Phase 17 Distribute the grease uniformly and generously on the entire toothed wheel. Phase 18 Apply grease also on the teeth of the worm gear on the grinder motor shaft. Phase 19 Couple the motor flange with the rest of the unit as shown in the figure.
Page 25
Phase 21 Proceed with fixture of the flange by means of the first two screws, tightening them fully down. Phase 22 Remove the two pins ad proceed with fixture of the two remaining screws Phase 23 Tighten the flange fixing screws fully down. Before fixing the grinder motor to the rest of the machine, check that the details indicated in the figure are positioned correctly EN Incanto DOT.indd...
Grinder disassembly Phase 1 (upper grinder disassembly) Press the release button indicated by the red arrow and at the same time turn the ringnut (indicated by the blue arrow) anticlockwise to the end of its stroke and remove the adjustment nut. Phase 2 (upper grinder disassembly) To facilitate disassembly, use a small...
Page 27
Phase 4 (lower grinder disassembly) Use a small screwdriver to completely remove the coffee residue with the aid of compressed air and vacuum cleaner Rotate the grinder anticlockwise, using a small screwdriver to lever it off as shown in the fi rst fi gure. blocked Phase 5 (lower grinder disassembly)
Grinder settings fig.1 fig.2 fig.3 To calibrate the grinders, proceed as follows: 1) Press the pin (pos.1 / fig.2) and rotate the ringnut (pos.2 / fig.2) clockwise (fig.1 / a) to fully tighten down the grinders (DO NOT FORCE). 2) The rotate the ringnut anticlockwise (fig. 1 / b) so that the two blue dots (on the upper ringnut and the activation button) are aligned (pos.
Ground coffee dose adjustment The coffee dose can be adjusted by means of potentiometer R26 on the electronic card (must only be performed by a Service Centre). Potentiometer R26 varies the input voltage to the microprocessor from 0 to 5 V. The following table provides comparisons for dose adjustments: Voltage (V) Coffee grinder pulses...
Electronics (operation of jumpers on the card). JP17 JP17 POS. COMPONENT DESCRIPTION FUNCTION Potentiometer 4 K7-5K / +- 20% The coffee dose can be varied by means of the potentiometer JP17 Jumper Jumper fitted: “water absence” not managed. Jumper Boiler temperature sensor setting EN Incanto DOT.indd 18/05/2005, 12.05...
Valve SBS To ensure correct operation of the valve SBS a long espresso coffee should be made, and during preparation of the latter, check the difference in speed of delivery between the maximum and minimum positions. The difference in delivery speed is approx. 2.5 times greater (and therefore VERY obvious!!). An excessively fine grinding influences operation of the valve SBS.
This guarantees constant optimal water for a perfect coffee. In four phases Saeco water first purifies the water, to achieve a unique coffee. The active carbons eliminate unpleasant odours or substances from the water, such as chlorine. The silver coating of the active carbon obstructs the reproduction of germs.
Page 33
As can be noted in the graph below, the “aqua prima” filter reduces water hardness by up to 50 % ��� �� �� �� �� �� �� �� �� �� � � �� �� �� �� �� �� �� Filtered water [ltr] ���������...