Venting - Carrier 59SC2E Installation, Start-Up, Operating And Service And Maintenance Instructions

Single-stage tall, 4-way multipoise high efficiency condensing gas furnace
Hide thumbs Also See for 59SC2E:
Table of Contents

Advertisement

59SC2E: Installation, Start-up, Operating and Service and Maintenance Instructions
Fig. 38 – Example of Single Stage Furnace Control
THERMOSTAT
NOTE 7
See notes 1, 2, 3, 6, 7 and 8
Single-Stage Furnace with Single-Speed Air Conditioner
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
THERMOSTAT
A210192
Single-Stage Furnace with Single-Speed Heat Pump
Fig. 39 – Thermostat Wiring Diagrams for Single Stage Furnace
with Single-Speed A/C & Heat Pump
Notes for thermostat diagrams:
1. Thermostat output signals may vary. Consult thermostat installation
instructions for more information.
2. Refer to outdoor equipment Installation Instructions for additional
information and setup procedure.
3. Configure the thermostat for air conditioner installations. Refer to
thermostat instructions.
4. Configure thermostat for HYBRID HEAT® dual fuel operation.
Refer to thermostat instructions.
5. Heat pump MUST have a high-pressure switch for HYBRID
HEAT® dual fuel applications.
6. For Single-stage AC or HP, configure thermostat for single-stage
compressor operation. Refer to thermostat instructions.
7. NO connection should be made to the furnace HUM terminal when
A230219
utilizing the thermostat's 24-volt humidifier output.
8. Thermostat terminal connection order on furnace control may vary-
reference furnace control labeling for designations
OPTIONAL VENTING BELOW THE FURNACE
The venting system may be positioned below the furnace ONLY IF the
factory accessory External Vent Trap Kit is used. The External Vent
Trap Kit is only approved for PVC/ABS DWV venting systems.
CAREFULLY FOLLOW THE INSTRUCTIONS PROVIDED
WITH THE EXTERNAL VENT TRAP KIT FOR LAYING OUT
THE VENTING SYSTEM AND THE DRAIN SYSTEM. The
instructions included with this furnace DO NOT APPLY to vent
systems that are located below the furnace.

VENTING

NOTE: Planning for the venting system should be done in conjunction
with planning for the ductwork, drainage, and furnace accessories, such
as air cleaners and humidifiers. Begin assembling the venting system
AFTER the furnace is set in place in the required orientation.
28
NOTE 7
See notes 1, 2, 3, 4, 5, 6, 7 and 8
NOTICE
!
A230220

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Series

Table of Contents