SECONDARY HANGING SYSTEM INSTRUCTIONS
For installation in the United States: Building codes in the U.S.A. do not require installation of a Secondary Hanging System. If
desired, the braided cable can be cut and removed using wire cutters (sold separately). Skip to FINAL INSTALLATION.
For installation in Canada: In compliance with building codes in Canada, installation of the Secondary Hanging System is required.
1. WARNING: Secondary support is required for this product. Failure to follow the steps below could result in property damage
and/or personal injury. Feed the loop of the braided cable, preassembled to the motor assembly, up through the outlet box
mounted in the ceiling (Figure 4.1).
2. Install secondary support screw, spring washer and support washer partly into the side of the brace installed in the ceiling.
Then loop the braided cable up and over the ceiling brace and place the open loop of the braided cable around the secondary
support screw. Note: The ceiling support brace may not be accessible from below. If not, it must be accessed from above.
Important: The braided cable must make a complete circle around the support brace to secure the fan (Figure 4.2).
3. Tighten the secondary support screw, securing the braided cable (Figure 4.3).
Figure 4.1

FINAL INSTALLATION

1. Use push-in connectors to connect the supply wires from outlet box to the lead wires according to the wiring diagram and the
following instructions (Figure 5.1):
• Push the White (neutral) supply wire and the white wire from lead wire into the the holes of one push-in connector.
• Push the Black (hot) supply wire and the black wire from lead wire into the the holes of one push-in connector.
WARNING: After the connections have been made, the connected wires should be turned upward and pushed carefully up
into the outlet box. Place the Black and White wire connections on opposite sides of the outlet box.
2. Connect the 3-pin connector extending from the downrod to the 3-pin connector on lead wire. Then, connect the green/bare
(ground) supply wire to the green wires from the downrod and the mounting bracket (Figure 5.2).
3. Raise the canopy, ensure the two mounting bracket screws are aligned with the J-shaped slots in the canopy. Then turn the canopy
in a clockwise direction until the mounting bracket screws are completely engaged in the J-shaped slots. Then, install the two
previously removed mounting bracket screws in the round holes. Securely tighten all mounting bracket screws (Figure 5.3).
Bare/Green (ground)
Black (hot)
White (neutral)
Figure 5.1
Braided Cable
Brace
Figure 4.2
3-Pin
Connector
Figure 5.2
Open Loop
Secondary
Support Screw
Support
Washer
Spring
Washer
Wire Connector
EN I 7
Secondary Support Screw
Figure 4.3
Figure 5.3
Mounting
Bracket Screw