Installation Checklist; Replacement Parts - Trane VR104GD-U Series Installation Instructions Manual

Single package gas heating / electric cooling
Table of Contents

Advertisement

INSTALLATION ADDRESS:
CITY:
UNIT MODEL #
UNIT SERIAL #
Unit Installed Minimum clearances
per
Figure 1 (page
5)?
INSTALLER NAME:
CITY:
Has the owner's information been
reviewed with the customer?
Has the Literature Package been
left with the unit?
ELECTRICAL SYSTEM
Electrical connections tight?
Line voltage polarity correct?
Rated Voltage (VOLTS):
L1-L2 Volts:
Has the thermostat been calibrated?
Is the thermostat level?
Is the heat anticipator setting
correct? (If Applicable)
VENTING SYSTEM
Is the vent hood installed?
Is vent hood free from restrictions
Filter(s) secured in place?
Filter(s) clean?
ATTENTION INSTALLERS:
It is your responsibility to know this product better than your customer. This
includes being able to install the product according to strict safety guidelines
and instructing the customer on how to operate and maintain the equipment
for the life of the product. Safety should always be the deciding factor when
installing this product and using common sense plays an important role as well.
Pay attention to all safety warnings and any other special notes highlighted
in the manual. Improper installation of the unit or failure to follow safety
warnings could result in serious injury, death, or property damage. These
instructions are primarily intended to assist qualified individuals experienced
in the proper installation of this appliance. Some local codes require licensed
installation/service personnel for this type of equipment.
Specifications & illustrations subject to change without notice or incurring obligations (07/22).
O'Fallon, MO, © Nortek Global HVAC LLC 2022. All Rights Reserved.

INSTALLATION CHECKLIST

STATE:
YES
NO
STATE:
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
Gas Type: (circle one)
Gas pipe connections leak-tested?
Gas Line Pressure (in - W.C.):
Is there adequate fresh air supply
for combustion and ventilation?
Installation Altitude (FT.):
Deration Percentage:
Unit Input (Btuh):
Supply Air Temperature (° F):
Return Air Temperature (° F):
Temperature Rise (° F):
DURING UNIT OPERATION:
Manifold pressure (in - W.C.):
REFRIGERATION SYSTEM
Was unit given 24 hr warm up
period for crankcase heaters
(if equipped)?
Stage-1 Liquid Pressure (high side):
Stage-1 Suction Pressure (low side):

REPLACEMENT PARTS

Replacement parts are available through your distributor. Please
have the complete model and serial number of the unit when ordering
replacement parts.
• Capacitors
• Compressors
• Contactors
• Gas Valves
• Ignition Controls
• Ignitors/Flame Sensors
• Blower Motor
• Fan Motor
• Inducer Blower Motor
COMPONENTS:
• Blower Assembly
• Burner Manifold
• Burners/Orifices
• Cabinet Panels
• Expansion Valves
GAS SYSTEM
Natural
Gas
YES
YES
YES
ELECTRICAL:
• Pressure Switches
• Relays
• Temperature Limit Switches
• Thermostats
• Time Delay Relays
• Transformers
MOTORS:
• Fan Grille
• Filter/Driers
• Gaskets
• Heat Exchanger