Trane YCX024G1L-M Installation Operation & Maintenance
Trane YCX024G1L-M Installation Operation & Maintenance

Trane YCX024G1L-M Installation Operation & Maintenance

Single package gas/electric 12 seer convertible 2-5 ton

Advertisement

I
O
STALLATIO
RATi
TE
CE
ALL phases of this installation
must comply with
NATIONAL,
STATE AND LOCAL CODES
YCX-IIOM-2C
18-EB21D5-4
Model:
YCX024G 1L-M
YCX030G 1L-M
YCX036G1,3-L-M
YCX036G1,3,4-H
YCX042G1,3-M
YCX048G1,3,4-H
YCX060G1,3,4-M
BAYLI FT002A
LIFTING LUG KIT
Single Package Gas/Electric
12 SEER Convertible
2 -5Ton
IMPORTANT--
This Document
is customer property and is to remain with this unit. Please return to service information
pack upon completion
of
work.
All phases of this installation must comply with the NATIONAL,
STATE & LOCAL CODES.
In the absence of local codes, the
installation must conform with National
Electric
Code -- ANSI/NFPA
70 or "LATEST
REVISION."
Since the manufacturer
has a policy of continuous
product
improvement, it reserves
the right to change
specifications
and design without notice.
© 2003 American Standard Inc. All rights reserved
10/03

Advertisement

Table of Contents
loading

Table of Contents