Chamberlain LiftMaster CSW200101U Installation Manual page 23

Commercial high-traffic ac swing gate operator
Table of Contents

Advertisement

STEP 9 continued...
DUAL GATES ONLY
WIRED DUAL GATES
Before digging, contact local underground utility locating companies. Use PVC conduit to prevent damage to cables.
1. Disconnect ALL power to the operator.
2. Trench across driveway to bury the shielded twisted pair cable.
3. Connect the wires from the shielded twisted pair cable to the Com Link terminals on the primary gate operator control board. NOTE: We
recommend that all accessories and board configurations are set on the primary operator.
4. Route the shielded twisted pair cable to the secondary gate operator's control board.
5. Connect the wires from the shielded twisted pair cable to the Com Link terminals on the secondary control board (Com Link A to Com Link A and
Com Link B to Com Link B). Ground the shield of the cable to the chassis ground of one operator.
6. Connect ALL power to the operator.
BIPART DELAY
The BIPART DELAY setting is used only with dual gate applications and is
used in applications where a mag-lock, solenoid lock, or decorative
overlay would require one gate to close before the other. The operator
with the BIPART DELAY dial ON will delay from the close limit when
opening and be the first to close from the open limit. The bipart delay can
be set from 1 to 8 seconds.
INSTALLATION
Com Link Data A
Com Link Data B
DUAL GATE WIRE TYPE (SHIELDED TWISTED PAIR CABLE)
22AWG up to 200 feet (61 m)
Wire must be rated at 30 Volt minimum
BIPART
DELAY
4
6
2
8
OPEN
OPEN
LEFT
RIGHT
HANDING
CURRENT
MOTOR DRIVE
RPM & LIMITS ALARM EXP.
ANTENNA
SENSOR
ID RESET
21
18AWG - 200-1000 feet (61-305 m)
Com Link Data A
Com Link Data B
BIPART
DELAY
4
2
6
8
OPEN
RIGHT
24 VAC IN
BOARD

Advertisement

Table of Contents
loading

Table of Contents