Download Print this page

Siemens SICHARGE D Product Information page 12

Hide thumbs Also See for SICHARGE D:

Advertisement

No.
5
Visual Inspection Inside
Inspect the inside charger ceiling, doors, grating, and cable bushings.
Check the heating system.
Make a visual inspection for any damages to all components.
Check the safety signs.
Are country-specific additional signs available?
Is system documentation (circuit diagrams, product documentation, OEM documentation) avai-
lable?
Dispenser Bus Bar Connection
6
Check the tightening torque (40 Nm) or mark on the nut of the PE ground connections.
Check the tightening torques (40 Nm) or mark on the nut of the Dispenser DC+ and DC- connec-
tions.
7
Clean Interior
Clean the interior if necessary.
Electrical Safety Measurements
8
Perform and document the electrical safety measurements of electrical protective devices and
earth resistance according to the local regulations and standards.
9
Power-On, Update and Close Door
Close and lock the door.
Turn on -QA2 in the SICHARGE D and power on the system.
Wait until the charging station is ready (LEDs green).
Comments and findings:
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Responsible person
(optional) Customer
Please take into consideration that the document is only valid after signatures of technician or if included in the final
document delivered to the customer.
Preventive Maintenance Checklist for SICHARGE D and Dispenser
Product Information, 07/2023, A5E52386197-AB
Checklist item
Name
Preventive Maintenance Checklist for Dispenser
Function
P
F
N/A
Signature
11

Advertisement

loading