Steps For Finalizing The Installation - Lopi 564 GSR2 35K CF Deluxe Installation Manual

Table of Contents

Advertisement

Finalizing the Installation

Steps for Finalizing the Installation

1.
Remove the glass (see page 35).
NOTE:
If using propane (LP) convert the appliance prior to installing the logs.
2.
We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected
once it enters the firebox, ensuring gas does not build up.
3.
Install the four AA batteries (see illustration below). The AA batteries act as a power backup in case the
household (AC) power goes out and are required for operation.
illustration below). Synchronize the transmitter to the IFC.
4.
Install the firebacks (if applicable -see page 51).
NOTE: If using glass firebacks or no firebacks, make sure the media tray covers are in place (see below)
5.
Install the ember chunks and ember bed glass (see page 38)
6.
Install the logs (see page 40).
7.
Replace the glass.
8.
Start the heater.
9.
Leak test all gas joints.
© Travis Industries
(for qualified installers only)
Install three AAA batteries into the remote (see
5/3/2021 - 1554
33
564 GSR2 35K CF (AUST)