8.2

Installation plan

- A -
1
2
- B -
1
2
Installation type A is recommended when the total consumption corresponds to the throughput rate of the compressor.
Installation type B is recommended when the air consumption constantly varies, with peak values which considerably
exceed the throughput rate of the compressor. The storage capacity of the tank must be dimensioned in such a way
that a possible short-term high air demand (peak air consumption) can be compensated.
Do not obstruct the ventilation grille (not even partially).
Prevent any recirculation of the outgoing cooling air.
Protect the dryer against draughts.
Note!
Contaminated intake air!
In the event that the intake air is strongly contaminated (ISO 8573.1 class 3.-3 or poorer quality), we
recommend the additional installation of a prefilter (e.g. CLEARPOINT F040), to avoid clogging of the
heat exchanger.
DRYPOINT® RA CT 200-500 NA 3PH
7
3
4
9
9
9
IN
OUT
3
4
6
9
9
8
IN
OUT
5
9
6
8
7
9
5
9
1
Air compressor
2
Aftercooler
3
Condensate separator
4
Prefilter
5
Bypass group
6
Dryer
7
Compressed-air tank
8
Final filter
9
Bekomat condensate drain