Heatilator I100 Installation Manual page 3

Hide thumbs Also See for I100:
Table of Contents

Advertisement

This standard work checklist is to be used by the installer in conjuction with, not instead of, the instructions contained in this installation
manual.
Customer:
Lot/Address
Model (circle one):
I100
WARNING! Risk of Fire or Explosion! Failure to install fireplace acording to these instructions can lead to a fire or
explosion.
Fireplace Install
Verified that the chase is insulated and sealed. (Pg. 11)
Verified clearances to combustibles. (Pg. 10)
Fireplace is leveled and secured. (Pg. 13)
Protective hearth strips installed per manual requirements. (Pg. 14)
Hearth extension size/height decided. (Pg. 30)
Outside air kit installed. (Pg 15)
Chimney Section 4 & 5 (Pg. 17)
Chimney configuration complies with diagrams.
Chimney installed, locked and secured in place with proper clearance.
Chimney air kit installed.
Firestops installed.
Attic insulation shield installed.
Roof flashing installed.
Termination installed.
Shrouds Section 6 (Pg. 27)
Shroud is installed properly per instructions.
Finishing Section 7 (Pg. 29)
Fi i hi
S
ti
7 (P
29)
Combustible materials not installed in non-combustible areas.
Verified all clearances meet installation manual requirements.
Mantels and wall projections comply with installation manual requirements.
Hearth extension installed per manual requirements.
Fireplace Setup Section 8 (Pg. 36)
All packaging and protective materials removed.
Molded brick panels installed correctly.
Grate is properly installed.
Firescreen installed properly.
Optional doors properly installed.
Manual bag and all of its contents are removed from the fireplace and given to the party
responsible for use and operation.
Hearth & Home Technologies recommends the following:
• Photographing the installation and copying this checklist for your file.
• That this checklist remain visible at all times on the fireplace until the installation is complete.
Comments: Further description of the issues, who is responsible (Installer/Builder/Other Trades, etc.) and corrective action needed:
Comments communicated to party responsible
ATTENTION INSTALLER:
Follow this Standard Work Checklist
__________________________ by ______________________on _________
(Builder/Gen. Contractor)
Heatilator • ICON I100 • 4013-263 Installers Manual • Rev S • 11/22
Date Installed:
Location of Fireplace:
Installer:
Dealer/Distributor Phone #
Serial #:
YES
IF NO, WHY?
(Installer)
4013-265 • Rev B • 3-14-13
(Date)
3