HP JG726A Installation Manual page 16

Table of Contents

Advertisement

Figure 9 Mounting and grounding positions on the HP 5930-2Slot+2QSFP+/HP 5930-2Slot+2QSFP+
TAA switch
(1) Power module-side mounting position
(3) Auxiliary grounding point 1
Attaching the mounting brackets and chassis rails to the chassis
1.
Align the mounting brackets with the screw holes in the chassis. Use M4 screws (provided) to
attach the mounting brackets to the chassis.
To install the mounting brackets at the power supply-side mounting position, see
10,
To install the mounting brackets at the network port-side mounting position, see
13,
2.
Align the chassis rails with the rail mounting holes in the chassis:
If the mounting brackets are in the power supply-side mounting position, align the chassis rails
with the screw holes at the front of the side panels (see
If the mounting brackets are in the network port-side mounting position, align the chassis rails
with the screw holes at the rear of the side panels (see
3.
Use M4 screws (provided) to attach the chassis rails to the chassis.
NOTE:
Secure the mounting brackets and chassis rails to both sides of the chassis in the same way.
To install the mounting brackets at the network port-side mounting position on the HP
5930-2Slot+2QSFP+/HP 5930-2Slot+2QSFP+ TAA and HP 5930-4Slot/HP 5930-4Slot TAA switches,
use the four screw holes nearest to the network port side. To install the mounting brackets at the power
supply-side mounting position on the HP 5930-2Slot+2QSFP+/HP 5930-2Slot+2QSFP+ TAA and HP
5930-4Slot/HP 5930-4Slot TAA switches, use the four screw holes nearest to the power supply side.
Figure 1
1, and
Figure
12.
Figure
14, and
Figure
(2) Primary grounding point
(4) Network port-side mounting position
15.
12
Figure
10,
Figure 1
1, and
Figure
13,
Figure
14, and
Figure
Figure
Figure
12).
Figure
15).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Flexfabric 5930Jg727aJh178aJh187aJh179aJh188a

Table of Contents