Wiring - SMC Networks EX245-EA2 Series Operation Manual

Fieldbus system profinet compatible si unit
Table of Contents

Advertisement

9.3. Wiring

Caution
To prevent damage, all power for the SI Unit and modules must be turned off (i.e. de-energized)
before the modules are installed or removed.
For a protection rating of IP65 to be ensured, all covering caps must be screwed down correctly
after wiring and setting have been performed.
For a protection rating of IP65 to be ensured, sockets that are not used must be fitted with the
Seal cap.
Pin allocation of the M12, 5 pins socket connector as shown in the following table:
Table. 9-1 Pin allocation of the connector for EX245-LA1 (Class A)
Pin
Signal
1
L+
2
I/Q
3
L-
4
C/Q
5
N.C.
∗: Pin functionality can be altered by selecting a different sub-module configuration.
Refer to
9.6 Sub-modules
Table. 9-3 Pin allocation of the connector for EX245-LB1 (Class B)
Pin
Signal
1
L+
2
P24
3
L-
4
C/Q
5
N24
∗: Pin functionality can be altered by selecting a different sub-module configuration.
Refer to
9.6 Sub-modules
Description / Power source
24 V / US1
Digital Input / US1
0 V / US1
IO-Link communication, DI or DO * / US1
Not Connected
Description / Power source
24 V / US1
24 V / US2
0 V / US1
IO-Link communication, DI or DO
0 V / US2
View of connector (module side)
View of connector (module side)
/ US1
- 58 -
2
5
1
3
4
2
5
1
3
4
No.EX※※-OMW0011-B

Advertisement

Table of Contents
loading

Table of Contents