8
|
Piping installation
To handle the stem cap
To handle the service cap
8.2.8 To connect the refrigerant piping to the outdoor unit
Installer reference guide
96
2 Insert a hexagon wrench (liquid side: 4 mm, gas side: 4 mm) into the valve
stem and turn the valve stem:
Counterclockwise to open
Clockwise to close
3 When the stop valve CANNOT be turned any further, stop turning.
4 Install the stop valve cover.
Result: The valve is now open/closed.
▪
The stem cap is sealed where indicated with the arrow. Do NOT damage it.
▪
After handling the stop valve, tighten the stem cap, and check for refrigerant
leaks.
Item
Stem cap, liquid side
Stem cap, gas side
▪
ALWAYS use a charge hose equipped with a valve depressor pin, since the service
port is a Schrader type valve.
▪
After handling the service port, tighten the service port cap, and check for
refrigerant leaks.
Item
Service port cap
1 Connect the liquid refrigerant connection from the indoor unit to the liquid
stop valve of the outdoor unit.
Tightening torque (N∙m)
13.5~16.5
22.5~27.5
Tightening torque (N∙m)
11.5~13.9
1×
2
1
ERGA04~08EAV3+V3A+V37 + EHSH/X(B)04+08P30+50EF
Daikin Altherma 3 R ECH₂O
4P678716-1A – 2022.07