Installation Of Compressed Air Connection - Beko BEKOKAT CC-720 Installation And Operation Manual

Catalytic converter
Table of Contents

Advertisement

Installation and Operation Manual BEKOKAT
4.5

Installation of compressed air connection

The compressed air connection of the BEKOKAT
condensate drain (see illustration).
The connection is designed as a cylindrical internal thread Rp 2" in accordance to
DIN EN 10226-1.
Proceed as follows to connect the BEKOKAT
1.
Connect BEKOKAT
2.
Inspect compliance with the safety instructions relating to the quality of the
compressed air.
Refer to the "Assembly" chapter.
3.
Inspect all bolt fittings for correct seating and tightness.
4.
Inspect the correct connection of the inlet and outlet pipes to the assembly unit.
5.
Subsequently initiate a leak tightness examination for the whole installation.
48 / 88
®
®
professionally to the compressed air line.
®
is located on the valves for inlet and
®
to the compressed gas system:
V01 /11-038

Advertisement

Table of Contents
loading

This manual is also suitable for:

4011162

Table of Contents