12.4 Checklist during commissioning

12.4.1 Minimum flow rate

ERLA11~16D + EBVH16SU23D
Daikin Altherma 3 R F
4P655196-1A – 2022.05
The fuses or locally installed protection devices are installed according to this document,
and have NOT been bypassed.
The power supply voltage matches the voltage on the identification label of the unit.
There are NO loose connections or damaged electrical components in the switch box.
There are NO damaged components or squeezed pipes on the inside of the indoor and
outdoor units.
Backup heater circuit breaker F1B (field supply) is turned ON.
There are NO refrigerant leaks.
The refrigerant pipes (gas and liquid) are thermally insulated.
The correct pipe size is installed and the pipes are properly insulated.
There is NO water leak inside the indoor unit.
The shut-off valves are properly installed and fully open.
The stop valves (gas and liquid) on the outdoor unit are fully open.
The air purge valve is open (at least 2 turns).
The domestic hot water tank kit has been installed on the cold water inlet of the DHW
tank. The pressure relief valve (DHW circuit) purges water when opened. Clean water
MUST come out.
The pressure relief valve (space heating circuit) purges water when opened. Clean water
MUST come out.
The minimum water volume is guaranteed in all conditions. See "To check the water
volume and flow rate" in
The domestic hot water tank is filled completely.
The minimum flow rate during backup heater/defrost operation is guaranteed in all
conditions. See "To check the water volume and flow rate" in
4
piping" [
 104].
To perform an air purge.
To perform a test run.
To perform an actuator test run.
Underfloor screed dryout function
The underfloor screed dryout function is started (if necessary).
Purpose
For a correct operating unit, it is important to check if the minimum flow rate is
reached. If needed, modify the bypass valve setting.
"8.5 Preparing water
piping" [
12
Commissioning
|
4
 104].
"8.5  Preparing water
Installer reference guide
247