Dometic FJ 1700 Installation Manual page 15

Air conditioning roof unit
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
FJ 1700, FJ 2000, FJ 2200, FJ 3200
To do this, proceed as follows:
➤ Connect the positive cable and the negative cable to the battery.
Connecting the circuit board
See fig. e
➤ Insert the 12-pin plug (1) in the socket (3) on the circuit board of the air outlet unit.
➤ Connect the 2-pin connector plug (2) to the wire from CI-Bus master panel
(optional).
8.6
Installing the air outlet unit Chillout ADB
See fig. f
➤ Attach the air outlet unit to the (1) fastening frame using the short fastening
screws.
See fig. e
➤ Install the air filter in the specified sequence.
See fig. f
➤ Fit the filter covers.
➤ Enter the new vehicle height and weight in the vehicle documents.
8.7
Installing the roof air conditioner with ADB
A
NOTICE! Damage hazard
Observe the structural strength of the roof of the vehicle. The roof of the
vehicle must be able to bear the weight of the roof air conditioner. The
roof must not be indented or deformed by the weight of the unit, even
over a longer period of time.
See fig. 0
➤ Lift the roof air conditioner onto the roof of the vehicle.
➤ Position the roof air conditioner over the installation opening.
Observe the direction of travel.
EN
Installation
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents