11
SERVICE WORK ON THE CHASSIS
11.13
Greasing the steering head bearing
11.14
Removing the start number plate
11.15
Installing the start number plate
Main work
–
Loosen screws
–
Remove screw
–
Loosen and retighten screw
Guideline
Screw, top steering head
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid stresses.
–
Mount and tighten screw
S01217-10
Guideline
Screw, top steering stem
–
Tighten screws
Guideline
Screw, top triple clamp
–
Check the steering head bearing play. (
Finishing work
–
Mount the handlebar cushion.
–
Remove the motorcycle from the lift stand. (
–
Remove the lower triple clamp.
–
Install the lower triple clamp.
800010-10
–
Remove screw
–
Unhook the start number plate from the brake line and remove it.
S01234-10
–
Position the brake line in holders
–
Position the start number plate. Mount and tighten screw
The holding lugs engage in the fender.
S01235-10
1
.
2
.
3
.
2
.
M8
1
.
(
p. 41)
(
p. 41)
1
.
A
on the start number plate.
M20x1.5
12 Nm (8.9 lbf ft)
Loctite
20 Nm
(14.8 lbf ft)
M8
17 Nm
(12.5 lbf ft)
p. 43)
p. 38)
1
.
44
®
243™