Gas Feeding; 4.10.1 Gas Feeding Line; Gas Train - Riello 568 M Installation, Use And Maintenance Instructions

Forced draught gas burner one-stage operation
Table of Contents

Advertisement

4.10

Gas feeding

Explosion danger due to fuel leaks in the pres-
ence of a flammable source.
Precautions: avoid knocking, attrition, sparks and
heat.
Make sure the fuel interception tap is closed be-
fore performing any operation on the burner.

4.10.1 Gas feeding line

1
D5099
Key (Fig. 14)
1
Gas input pipe
2
Manual gate (the responsibility of the installer)
3
Gas pressure gauge (the responsibility of the installer)
4
Filter
5
Gas pressure switch
6
Safety valve
7
Pressure stabiliser
8
Adjustment valve
Code
Model
3970553
MB 407/1 - RSD 20
Installation
2
3
M1
4

Gas train

The fuel supply line must be installed by qualified
personnel, in compliance with current standards
and laws.
WARNING
5
6
7
M1 Gas-supply pressure test point on the pressure switch
M2 Pressure coupling test point
4.10.2 Gas train
Approved according to standard EN 676 and provided separately
from the burner. Supplied separately for its adjustment, see the
enclosed instructions.
The train-burner combination is indicated in Tab. E.
Connections
Burner
Rp 3/4
Rp 3/4
15
GB
8
Use
Natural gas and LPG
M2
Fig. 14
Tab. E
20063667

Advertisement

Table of Contents
loading

This manual is also suitable for:

40 fs153756803

Table of Contents