Installation Diagram - Lochinvar EcoCharger ECH 32-220 G CE Installation, Commissioning, User & Maintenance Instructions

Gas fired condensing water heater
Table of Contents

Advertisement

7.3
0311723_ECH_32-129_III_ENEN_V2.6, 2022-10-17

Installation diagram

Fig. Installation diagram
U N V E N T E D
14
14
11
12
T
B
10
D
V E N T E D
17
14
11
12
T
B
D
10
14
C
3
4
6
5
4
16
5
1
15
9
13
H
19
E
4
14
1 4
18
C
4
3
4
5
6
4
C
9
13
1.
Pressure reducing
valve (mandatory if
the mains water
pressure is too high)
3.
T&P valve
4.
Stop valve
(recommended)
5.
Non-return valve
(mandatory)
6.
Circulation pump
(optional)
9.
Drain valve
10.
Manual gas valve
(mandatory)
11.
Service stop valve
12.
Temperature gauge
(optional)
13.
Condensate drain
14.
Draw-off points
4
A
15.
Expansion valve
(mandatory)
16.
Expansion vessel
(mandatory)
17.
3-way aeration valve
(recommended)
A
18.
Cold water head tank
19.
Float switch
A.
Cold water supply
B.
Hot water outlet
C.
Circulation pipe
D.
Gas supply
E.
Overflow pipe
H.
Overflow protection
IM D -0 780 R 0
55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents