Standby Power; Connections To A Building's Electrical System; System Ground - Honda EU2200ITAN Owner's Manual

Table of Contents

Advertisement

OPERATION

STANDBY POWER

Connections to a Building's Electrical System

Connections for standby power to a building's electrical system must be made
by a qualified electrician. The connection must isolate the generator power
from utility power, and must comply with all applicable laws and electrical
codes.
In some areas, generators are required by law to be registered with local utility
companies. Check local regulations for proper registration and use procedures.

System Ground

This generator has a system ground that connects generator frame components
to ground terminals in the AC output receptacles. The system ground is not
connected to the AC neutral wire.
54
Improper connections to a building's
electrical system can allow current from
the generator to backfeed into the
utility lines.
Such backfeed may electrocute utility
company workers or others who contact
the lines during a power outage, and the
generator may explode, burn, or cause
fires when utility power is restored.
Consult the utility company or a
qualified electrician prior to making any
power connections.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eu2200i companionEu2200iEu2200itan1Eu2200itag1Eu2200itan3Eu2200tag3

Table of Contents