Installing The Handle Assembly - Toro 30435 Operator's Manual

Table of Contents

Advertisement

Step
Description
9
No parts needed
Oil drain hose
Operator's Manual
10
Engine Operator's Manual
Parts Catalog
Registration card
1
St e p
Parts needed for this step:
1 Handle assembly
2 Flange bolts, 3/8 x 1 inch
2 Flange bolts, 3/8 x 1–1/4 inch
4 Flange nuts, 3/8 inch

Installing the Handle Assembly

1. Align handle with upper mounting holes in rear frame
(Fig. 2).
2. Secure the handle at each upper mounting hole with a
flange bolt (3/8 x 1–1/4 inch) and flange nut (Fig. 2).
3. Select the low position for the lower mounting hole
(Fig. 2).
4. Secure the handle at each lower mounting hole with a
flange bolt (3/8 x 1 inch) and flange nut (Fig. 2).
Note: The handle position can be adjusted to match the
operator 's height preference.
Qty.
Use
Setting up the hydro control linkage
1
Use for draining engine oil
1
Read before operating machine
1
Read before operating machine
1
1
Fill out and return to Toro
7
8
9
4
2
6
1. Handle assembly
2. Rear frame
3. Flange nut, 3/8 inch
4. Flange bolt, 3/8 x 1 inch
5. Upper mounting hole
Note: Handle assembly must be installed before fuel tank
is installed.
15
5
1
3
m–6600
Figure 2
6. Lower mounting holes
7. Low position
8. High position
9. Flange bolt, 3/8 x
1–1/4 inch

Advertisement

Table of Contents
loading

Table of Contents