Download Print this page

Cisco C6880-X-LE-16P10G Installing Manual page 10

Advertisement

Installing a Modular Port Card
Step 3
Remove the modular port card from the protective packing.
Step 4
Press the lever on the extraction handle to release the latch, and rotate the handle outwards.
Figure 28: Pressing the Lever on the Port Card
Step 5
Insert the port card into the chassis. Slide the port card into the slot until the back of the port card faceplate
is flush with the chassis faceplate.
Figure 29: Installing the Modular Port Card
Step 6
Close the latch on the extraction handle by pressing the lever until you hear a click, and it latches.
Catalyst 6880-X Switch Hardware Installation Guide
66
Installing the Modular Port Card
OL-30827-02

Advertisement

loading

This manual is also suitable for:

C6880-x-16p10gC6880-x-cvr-e