Pressure Switch Testing & Replacement - Bradford White RG1PV40SN19 Service Manual

Through-the-wall (ttw) gas water heaters
Table of Contents

Advertisement

PV Series
Pressure Switch Replacement
Step 1.
Position gas control power
switch to "OFF" position.
Step 2.
Remove the three screws (T20
Torx driver) from control
access cover on blower
assembly and remove cover
(see photo 3).
Step 3.
Carefully remove pressure switch from blower housing (see photo 4).
Step 4.
Disconnect tubing from pressure switch. (see photo 5).
Step 5.
Disconnect red wires from pressure switch (see photo 6).
Step 6.
Reconnect wires from step 6 to new pressure switch.
Step 7.
Reconnect tubing to new pressure switch.
Step 8.
Carefully position pressure switch into blower housing.
Step 9.
Position gas control power switch to "ON" position and verify proper heater
operation.
Step 10.
Replace control access cover from step 2.
3
5
115-volt potential exposure. Use
caution to avoid personal injury.
PRESSURE SWITCH
4
Slide pressure switch in direction of
arrow while tilting slightly away
from blower housing.
6
21
WARNING
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents