Pressure Switch Testing & Replacement - Bradford White UPV75 Series Service Manual

Ultra low nox through-the-wall gas water heaters
Table of Contents

Advertisement

UPV75 Service Procedure III – Pressure Switch Testing and
Replacement
Pressure Switch Testing
Step 1. Position power switch on gas control to the
"OFF" position.
Step 2. Remove the three screws (T20 Torx driver) from control access cover on blower assembly
and remove cover (see photo 1).
Step 3. Carefully remove pressure switch from blower housing (see photo 2).
With steps 1, 2, & 3
complete, disconnect
wire leads from
pressure switch.
Use a multi-meter set to the
ohms setting. With blower off,
check across pressure switch
terminals. Are switch contacts
open? (no electrical continuity)
Y
Position gas valve
power switch to
the "ON" position
and adjust
thermostat to call
for heat, this will
start the blower.
Check with the
multi-meter, do
pressure switch
contacts close
with the blower
running?
Y
Switch contacts are
OK. See safety circuit
trace (page 30).
18
Check tubing and pressure
N
tap on switch for blockage.
Check
Y
tubing and
pressure
N
tap on
switch for
blockage. Is
N
there
blockage?
115 volt potential exposure.
Use caution to avoid personal injury.
1
Pressure
switch wire
leads
Is there blockage?
Y
Clear blockage.
Y
Is vent system
blocked?
N
Is vent system length
within vent table
specifications listed on
page 7.
N
Reconfigure vent
system to be compliant
with vent tables.
WARNING
Slide pressure switch in direction
of arrow while tilting slightly away
from blower housing.
N
Replace switch
(see page 19).
Y
See blower testing
Y
(page 20)
Is blower OK?
Correct blower
problem.
2
N
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Urg2pv75h76 n19 seriesUlg2pv75h76 n19 series

Table of Contents