Block connection cables inside the battery cabinet, using a clamp inserted in the holes made during
construction, see Fig. 12. Be careful not to scratch the cable insulation.

START-UP PROCEDURE

Checks to be made on the battery cabinet
Check grounding connection (PE).
Check that the battery switch (Q1) is open.
Check battery cabinet and UPS connections to poles "+" and "-".
Verify the battery voltages are within the range +235 ~ +270Vdc probing the points listed in the following
table on Q1 switch with a multimeter, according to the Fig. 11 image.
Reposition the previously removed side panels.
Switch on the UPS, leaving the battery cabinet switch (Q1) open.
When the UPS is running (after 2 minutes), check on the battery cabinet that:
- Between bars (-) and (+) Fig. 11: voltage is within the range of 235 - 280Vdc.
Reposition previously removed internal panels A and B, see Fig. 2
Replace the door.
If the checks and controls listed above are positive, you can close the battery cabinet switch (Q1).
Product
20 batteries version
40 batteries version
- ENGLISH -
Fig. 12
(+) Lead
1
1
3
.
16
(-) Lead
5
7
5

Advertisement

Chapters

Table of Contents
loading

Table of Contents