Step 1 - Preparation - Haier GE ASH124UCDDA Installation Instructions Manual

Ductless single zone with highwall indoor unit
Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions

Step 1 - Preparation

Select the Outdoor location:
• Choose a level place solid enough to bear the
weight and vibration of the OD unit and where the
operation noise will not be amplified.
• Choose a location where the hot air discharge and/
or noise will not create a nuisance for neighbors.
• Ensure there is sufficient space to maneuver the
OD unit into place.
• Ensure there is sufficient space and no obstructions
for the air inlet and outlet.
• I nstall the unit's power/communication wiring at
least 10 feet away from television and radio sets to
prevent interference.
• Ensure any moisture sensitive items are kept away
from the condensate drain path of the OD unit.
31-5000788 Rev. 0
NOTES:
• OD unit cannot hang from a ceiling or be stacked.
• Ensure that accumulated snow and debris will not
block the air inlet or the coil if installing the outdoor
unit with a fence or guard rail around it.
• Ensure ventilation in case of refrigerant leakage.
R-410A is a safe, nontoxic, and nonflammable
refrigerant.
• Avoid installing the OD unit where corrosive gases,
such as sulfur oxides, ammonia, and sulfurous gas
are produced.
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ge ash3036ucddaGe ash4248ucdda

Table of Contents