Dometic FreshJet3 Series Installation Manual page 11

Climate control rooftop air conditioner
Hide thumbs Also See for FreshJet3 Series:
Table of Contents

Advertisement

Available languages

Available languages

Rooftop air conditioner (air distribution box, wall thermostat controls)
6 .3 .1 Using an existing roof vent opening
I
If the roof does not have an existing roof vent, go to
"Making a new roof opening" on page 11.
This section describes how to prepare the RV roof when
using an existing vent.
1. Shut off the gas supply, disconnect the 115 VAC
power from the RV, and disconnect the positive (+)
12 VDC terminal from the supply battery.
2. Unscrew and remove the roof vent.
3. Remove the caulking compound around the
opening.
4. Seal the screw holes and seams where the roof
gasket will be located. Use a good grade of
all-weather sealant.
5. Measure the roof opening (review "Placement
requirements" on page 7). If the roof opening
is within specifications, go to "Routing the supply
wiring to the roof opening" on page 12.
6. If the opening needs to be resized, proceed to
"Making a new roof opening" on page 11.
– If the opening exceeds 14.4 x 14.4 in.
(366 x 366 mm), it will be necessary to reduce the
size of the opening.
– If the opening is less than 14.1 x 14.1 in.
(358 x 358 mm), it will be necessary to enlarge
the opening.
EN
6 .3 .2 Making a new roof opening
I
If the roof has an existing roof vent, see "Using an
existing roof vent opening" on page 11.
This section describes how to prepare the RV roof when
making a new roof opening.
1. Shut off the gas supply, disconnect the 115 VAC
power from the RV, and disconnect the positive (+)
12 VDC terminal from the supply battery.
2. Carefully mark the required roof opening. See
"Placement requirements" on page 7.
q q
w w
e e
7 Structure for a new roof opening
Incorrect
q
Correct
w
3. Make sure the new opening does not compromise
the roof's structural integrity.
– Do not cut the roof structure or the rafters.
– The rafters should remain supported by a cross
beam.
– The opening should be between the rafters.
4. Carefully cut the required roof opening.
Pre-installation
Correct
e
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents