Read the system manual "S7-1500 Automation System"
Prior to installation, connecting up and commissioning, read the relevant sections in the
system manual "S7-1500 Automation System" (references to documentation, refer to the
section Documentation (Page 9)).
Make sure that the power supply is turned off when installing/uninstalling the devices.
Configuration
Commissioning the CP fully is only possible if the STEP 7 project data is complete.
Procedure for installation and commissioning
Step
SIMATIC CP 1542-5
Equipment Manual, 01/2023, C79000-G8976-C326-05
WARNING
Execution
1
When installing and connecting up,
keep to the procedures described for
installing I/O modules in the system
manual "S7-1500 Automation
System".
2
Connect the CP to PROFIBUS via the
RS-485 socket.
3
Turn on the power supply.
4
Close the front covers of the module
and keep them closed during
operation.
5
The remaining steps in commissioning
involve downloading the STEP 7
project data.
Installation, wiring, commissioning, operation, disassembly
Notes and explanations
Underside of the CP
The STEP 7 project data of the CP is transferred
when you download to the station. To load the
station, connect the engineering station on which
the project data is located to the Ethernet/MPI
interface of the CPU.
You will find more detailed information on loading
in the following sections of the STEP 7 online help:
Downloading project data
Using online and diagnostics functions
3.3 Installation
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

S7-1500

Table of Contents