Other Control; Initial Setup - LG Multi V Water IV ARNU07GTU 2 Series Service Manual

Hide thumbs Also See for Multi V Water IV ARNU07GTU 2 Series:
Table of Contents

Advertisement

4. Other control

4.1 Initial setup

There are 4 initial setup steps before running.
All DIP switch setting must be completed before initial setup.
1) Step 1 : factory setting value display
Factory setting value is displayed in 7 segment on PCB for 24sec.
All dip switches must be set properly before step 1.
Power is on
Master model code is displayed (3sec)
Slave1 model code is displayed (3sec)
Slave2 model code is displayed (3sec)
Total capacity including sub units is
displayed (2sec)
Heat pump : Display 2 is default value
Power type
Model type
Copyright ©2013 LG Electronics. Inc. All right reserved.
Only for training and service purposes
- 25 -
Function
LGE Internal Use Only

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Multi v water iv arnu09gtu 2 seriesMulti v water iv arnu12gtu 2 seriesMulti v water iv arnu18gtt 2 seriesMulti v water iv arnu24gtt 2 seriesMulti v water iv arnu05gtr 2 seriesMulti v water iv arnu07gtr 2 series ... Show all

Table of Contents