Continuity Of Protective Earthing And Equipotential Bonding Conductors; Set Limits - Fluke SMFT-1000 User Manual

Multifunction pv analyzer
Hide thumbs Also See for SMFT-1000:
Table of Contents

Advertisement

Continuity of Protective Earthing and Equipotential Bonding Conductors

For accurate measurements, always compensate the resistance of the test leads before you
make measurements:
1. Turn on the PV Analyzer.
2. Turn the rotary switch to
3. Zero (short) the green lead and yellow lead.
4. Push
For more information, see
5. Follow the on-screen prompts.
6. To assign Pass or Failed status, set the regulatory limits for the measurements.
You cannot change the limits after the measurement is taken. If you change the limit,
you must repeat the measurement.

Set Limits

The regulatory limit is based on the length of the cable used in the test.
To set:
1. Turn on the PV Analyzer.
2. Turn the rotary switch to
3. Use
  
4. Push
The Manual Entry screen shows on the display.
5. Push
6. Use
7. Adjust the Cross Section and Material options as required.
8. Push
9. Push
Find Quality Products Online at:
.
.
Figure
.
or
to highlight an option.
to edit the option.
to open the Adjustment menu.
to change the value.
to toggle between the Manual Entry screen and Auto Calculate limit.
to save the calculation and return to the
GlobalTestSupply
www.
1.
Note
Measurement screen.
Multifunction PV Analyzer
.com
sales@GlobalTestSupply.com
Test Setup
17

Advertisement

Table of Contents
loading

Table of Contents