STEP 3: INSTALLING
HYDRONIC
COMPONENTS
A low-water cutoff must be installed to protect the unit
from dry-fire.
Screw extension nipple into 3/4" tapping on top of the
absorption unit and install relief valve into top of nipple
with the spindle in the vertical
position (i.e., with the
valve discharge in the horizontal)(See
Figure 2.4).
Most localities require the discharge piping to terminate
within 6" of the floor. Check local code requirements
if in
doubt. Discharge piping must be of same size or larger
than the relief valve outlet and should be run as short
and straight as possible. Elbows in the discharge piping
should be placed as close to the valve as possible.
If
valve discharge
is to be drained away, the discharge
piping must not be hard-piped to the drain piping (i.e.,
an open funnel or similar arrangement must be used).
CAUTION:
Piping must be installed
from the relief
valve
discharge
so there
will
be no danger
of
scalding personnel.
OPTIONAL
FLOAT
LOW WATER
CUT OFF
PRESSURE
_ RELIEF VALVE
PRESSURE
RELIEF
_VALVE
DISCHARGE
J
FIGURE 2.4
STEP 4: VENTING
BOILER
Install draft hood on boiler. If the draft hood shroud has a
hole near the relief opening for installing a spill switch,
mount draft hood so the hole faces to the front of the
boiler. Spill switches are provided on Model VGA-175B,
VGA-200B &VGA-250B boilers.
Applicable
boiler is equipped
with a factory-mounted
spill switch harness/mounting
bracket assembly;
spill
switch is provided in plastic bag. See Figure 2.5. Install
mounting
bracket
on outside
surface
of draft hood
shroud with screws provided (HARNESS MUST BE ON
OUTSIDE OF SHROUD).
Install spill switch in hole in
shroud (on outside surface)
with screws provided. Plug
wiring leads from harness/bracket
assembly onto flat
terminals on spill switch.
NOTE: Boiler will not operate unless wiring leads to
spill switch are connected.
INSTALL ....
CONNECT
INSTALL
SWITCH
WIRE
MOUNTING
IN OPENING
LEADS
BRACKET
ON DRAFTHOOD
ON DRAFTHOOD
\\\
\,\\
FIGURE 2.5
If vent damper is supplied with boiler, it must be installed
between the top of the draft hood and the flue pipe. See
"Installing The Vent Damper" instructions.
Connect draft hood to chimney or Class B vent. Flue
pipe must be same diameter as the draft hood outlet.