HydroTherm VGAB Series Installation, Operation And Maintenance Manual page 15

Table of Contents

Advertisement

OPERATING
SEQUENCE
FOR
STEAM
BOILERS
EQUIPPED
WITH
STANDING
PILOT,
VENT
DAMPER,
HI-LINIT_
E,C,O
&
67
LWCO
I,
MOTOR
DRIVES
VENT
DAMPER
TO
C_IqSE]3 PBSITTJ3N
AN]3
REMAINS
CLOSED
DURING
STANDBY,
STANDING
PILOT
REMAINS
L_,
3,
SENS_G
CIRCUIT
IS
CONT]]_.E]USLY
NBN_TBRED,
4,
THERMOSTAT
(J3R OPERATING
CONTRI]L)
CAU_S
FOR
HEAT,
5,
DAMPER
BLADE
DP_S.
6,
DAMPER
E31"DSWITCH
CLOSES
G°PJ3XFIJIGVEN-_
DAMPER
OPEN)
7,
MAIN
VALVE
IS E-NERB-LZ£-D
8.
UNIT
OPERATES
UNTIL
THERMOSTAT
_R
OPERATING
CDNTRD_
IS SATISFIED,
9,
SYSTEN
R£-FUPJIS TD STANDBY
WITH
DAMPER
CLOSE-D,
FIELD
WIRING
FACTORY
WIRING-
PRESSURE
67
CDN_PJ]L
LWCD
THERMDSTAT
OR
DP ER_ T_NG
BLK
I
_PEPzJ 13o I t IF
I/S
I
I
GAS
VALVE
[
-J
U5/24V
TRANSF,
U
GAS
--E_
VALVE
SECI2NDARY
PRESSURE
CONTROL
IT
ANY
BE- THE
DRIGLNAL
W'_P-Z AS
SUPPI_
WITH
THE
APPLIANCE
MUST
BE
REPLACE-D,
['T MUST
BE
REPLACED
_TN
TYPE
MT_/
(I05°C)
WIRE
DR
ITS
EQUI_/ALENT,
LI
LB
i-_
l15V
AC
q
tAAA22222J
I15/24V
PFTTT]
42-5745
REV
1
PRESSURE
SPILL
T'STAT
OR
°
RDLLDLrT
S_/,TCH
GAS
VALVE
VALVE
-------_SECON'BARY
PRESSURE
CQNTEBL
SPILL
AND
R£]LLDUT
S_/ITCHES
USED
_
INPUT
IS
LESS
THAN
300,000
BTUH
FIGURE 2.17: WIRING DIAGRAM & OPERATION
SEQUENCE FOR BOILERS EQUIPPED WITH
STANDING PILOT, MCDONNELL-MILLER
LOW
WATER CUT-OFF & SECOND PRESSURE
CONTROL (FOR VGA-350 & VGA-400 N.G.)
OPERATING
SEQUENCE
FOR
SREAM
BOILERS
EQUIPPED
WITH
STANDING
PILOT,
VENT
DAMPER,
HI-LIMIT,
ECO
& CG-400
SERIES
LWCO
1, MOTOR
DRIVES VENT
DAMPER
TO CLOSED
POSITION
AND
REMAINS
CLOSED
DURING
STANDBY,
2, STANDING
PILOT REMAINS
LIT,
3, SENSING
CIRCUIT
IS CONTINUOUSLY
MONITORED,
4, THERMOSTAT
(OR OPERATING
CONTROL)
CALLS
FOR HEAT,
5, DAMPER
BLADE
OPENS,
6, DAMPER
END SWITCH
CLOSES
(PROVING
DAMPER
OPEN),
7, MAIN
VALVE
IS ENERGIZED,
8, UNIT
OPERATES
UNTIL
THERMOSTAT
(OR OPERATING
CONTROL)
IS SATISFIED,
9, SYSTEM
RETURNS
TO STANDBY
WITH
DAMPER
CLOSED,
FIELD WIRING
FACTORY WIRING
?
THERMOSTAToR
OPER
LOW WATER
CONTROL
CUTOFF
PRESSURE
(N) (H)
(B)
BUR
CONTROL F_
2
l
P1 P2
A NER
I
IT F° T ° T I
TI
_.s,=4v
'
/
'
0LOEI
k
BLK
GAS VALVE
OAMPRR
I_ol I IREO /
i_EO I o,,_,I
CONTROL
SVALVE
IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE BOILER
MUST BE REPLACED,USE A SIMILAR WIRE OF 105_ C RATING.
H
t--
115VAC
LWCO
(H)
(B)
L.LU,_.LU..i.,U
115V/24V
Ctq'q'qq
-1
VENT
GAS VALVE
_o
.................
I
CONTROL
_
o
GAS VALVE
N
=i
FIGURE 2.18: WIRING DIAGRAM & OPERATION
SEQUENCE FOR BOILERS EQUIPPED WITH
STANDING PILOT, CG-400 SERIES LWCO &
SECOND PRESSURE CONTROL (FOR VGA-350
& VGA-400 N.G.)
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents