Commissioning - Panasonic 5054 Technical Manual

Table of Contents

Advertisement

13

Commissioning

This chapter describes the correct procedures to install, set, and check the display unit.
Preparations
1. Prepare the FDCIE:
2. Ensure that the cable (RS485 bus) to the display unit is connected.
3. Connect the cable from the FDCIE to the display unit terminal block "J5".
4. Re-place the fuse in FT1020G3 or restore power to FT128.
Set Unit Type, Address, and Language
1. Select Service menu / 'Unit / Address / Language'
2. Select Unit type and choose one of the unit types. Press
3. Select Unit Address and set the address with the arrow buttons. Press
4. Select Language and then choose "English" from the list. Press
5. Return to the Service menu and press the "Save & Restart Device" button. The
unit will restart.
Programming in EBLWin and Downloading SSD
1. Connect a PC to the FDCIE.
2. Download the SSD to the FDCIE.
When the SSD download to the FDCIE is completed, it will restart. Then the
download of SSD to the display unit(s) will take place. During the download, the
following will be shown on the display: "SSD download in progress"
3. After the download of the SSD, the unit will restart and then start working in normal
operation mode.
FT1020G3: Remove the fuse "F19" on the main board.
FT128: Ensure to power of the FDCIE is disconnected and that the
communication module 4552 is plugged on the main board (4556).
31
Technical Manual
5054 Rev 0
For Firmware V2.0.x

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents